1 00:00:16,269 --> 00:00:13,549 Saturn five quarterly film report number 2 00:00:20,290 --> 00:00:16,279 five covers progress from December 1st 3 00:00:22,910 --> 00:00:20,300 1963 through February 29th 1964 4 00:00:31,550 --> 00:00:22,920 highlighting Saturn ground test stage 5 00:00:32,990 --> 00:00:31,560 construction s 1c efforts at the 6 00:00:35,450 --> 00:00:33,000 Marshall Space Flight Center this 7 00:00:37,700 --> 00:00:35,460 quarter were primarily in support of the 8 00:00:42,350 --> 00:00:37,710 test fuel tank and the static firing 9 00:00:44,810 --> 00:00:42,360 test stage following completion of fuel 10 00:00:46,910 --> 00:00:44,820 tank assembly last quarter the liquid 11 00:00:49,279 --> 00:00:46,920 oxygen tunnel for the tank was trimmed 12 00:00:52,850 --> 00:00:49,289 fitted and welded into the bulkheads in 13 00:00:57,500 --> 00:00:52,860 January later s 1c tanks will each have 14 00:00:59,869 --> 00:00:57,510 five such LOX tunnels structural 15 00:01:02,180 --> 00:00:59,879 assembly of the aft adapter for the test 16 00:01:04,789 --> 00:01:02,190 fuel tank was completed in early 17 00:01:06,859 --> 00:01:04,799 February and the adapter was placed in 18 00:01:11,450 --> 00:01:06,869 the vertical Assembly Building pit for 19 00:01:13,789 --> 00:01:11,460 mating with the tank Marshalls 20 00:01:16,429 --> 00:01:13,799 hydrostatic test tower part of the 21 00:01:18,609 --> 00:01:16,439 vertical Assembly Building was used for 22 00:01:21,050 --> 00:01:18,619 the first time in early february during 23 00:01:24,219 --> 00:01:21,060 hydrostatic pressure testing of the test 24 00:01:26,690 --> 00:01:24,229 fuel tank the tank was filled with some 25 00:01:28,929 --> 00:01:26,700 225,000 gallons of water weighing 26 00:01:32,330 --> 00:01:28,939 approximately two million pounds 27 00:01:34,969 --> 00:01:32,340 pressurization totalled 30 psi G at the 28 00:01:37,399 --> 00:01:34,979 lower bulkhead the tank was instrumented 29 00:01:40,670 --> 00:01:37,409 with some 250 strain gauges and 30 00:01:43,819 --> 00:01:40,680 deflection transducers in areas expected 31 00:01:46,249 --> 00:01:43,829 to experience high stress a fluorescent 32 00:01:49,280 --> 00:01:46,259 dye which glows under ultraviolet light 33 00:01:51,260 --> 00:01:49,290 was mixed with the deionized water as an 34 00:01:56,270 --> 00:01:51,270 aid in checking for any leaks around 35 00:01:58,700 --> 00:01:56,280 weld seams following the successful 36 00:02:00,800 --> 00:01:58,710 pressure testing the tank was lifted 37 00:02:05,420 --> 00:02:00,810 from the hydrostatic Tower by means of 38 00:02:08,389 --> 00:02:05,430 giant cranes and set down on top of the 39 00:02:11,390 --> 00:02:08,399 AFT adapter for mating to it nating was 40 00:02:13,040 --> 00:02:11,400 by means of mechanical fasteners the AFT 41 00:02:17,750 --> 00:02:13,050 adapter 42 00:02:21,770 --> 00:02:17,760 tank are special items to permit 43 00:02:24,140 --> 00:02:21,780 structural testing of the tank in 44 00:02:26,120 --> 00:02:24,150 assembly operations on the s-1 CT 45 00:02:28,520 --> 00:02:26,130 welding of the upper fuel bulkhead to 46 00:02:30,680 --> 00:02:28,530 the wiring was begun out of sequence in 47 00:02:32,540 --> 00:02:30,690 order to make optimum use of tooling 48 00:02:34,310 --> 00:02:32,550 while weld certification tests were 49 00:02:36,740 --> 00:02:34,320 being conducted to solve problems 50 00:02:39,620 --> 00:02:36,750 encountered during final assembly of the 51 00:02:42,110 --> 00:02:39,630 lower bulkhead the law of fuel book had 52 00:02:44,780 --> 00:02:42,120 two locks tunnel extension weld and the 53 00:02:48,740 --> 00:02:44,790 upper fuel book had polar kept weld had 54 00:02:50,930 --> 00:02:48,750 both been rejected and removed welding 55 00:02:53,210 --> 00:02:50,940 of the s-1 C T law of fuel tank 56 00:02:57,830 --> 00:02:53,220 cylindrical skin assembly was completed 57 00:02:59,720 --> 00:02:57,840 during the quarter all skin sections 58 00:03:02,030 --> 00:02:59,730 were available for the upper fuel tank 59 00:03:03,920 --> 00:03:02,040 cylindrical skin assembly but welding 60 00:03:09,530 --> 00:03:03,930 was held up until completion of the weld 61 00:03:11,780 --> 00:03:09,540 certification program assembly 62 00:03:13,460 --> 00:03:11,790 operations on the s-1 CT thrust 63 00:03:15,950 --> 00:03:13,470 structure continued at the Marshall 64 00:03:18,320 --> 00:03:15,960 Center during the report period the four 65 00:03:20,780 --> 00:03:18,330 thrust posts delivered to Marshall in 66 00:03:22,310 --> 00:03:20,790 early January have been fitted and 67 00:03:24,890 --> 00:03:22,320 installed in the thrust structure 68 00:03:30,430 --> 00:03:24,900 assembly fixture the thrust structure is 69 00:03:35,810 --> 00:03:33,710 Assembly of s1 C mock-ups continued at 70 00:03:37,699 --> 00:03:35,820 Marshall dis quarter with installation 71 00:03:39,410 --> 00:03:37,709 of the control pressure system in the 72 00:03:42,410 --> 00:03:39,420 forward and hitter tank mock-up 73 00:03:44,090 --> 00:03:42,420 virtually completed the basic heat 74 00:03:45,979 --> 00:03:44,100 shield support structure has been 75 00:03:50,060 --> 00:03:45,989 assembled and installed in the tail 76 00:03:51,440 --> 00:03:50,070 section mock-up at Marshalls s1 see 77 00:03:54,110 --> 00:03:51,450 static test stand 78 00:03:57,470 --> 00:03:54,120 all major welding on the load platform 79 00:03:59,390 --> 00:03:57,480 has been completed the 1,900 ton 80 00:04:01,400 --> 00:03:59,400 deflector has been rolled into its 81 00:04:05,360 --> 00:04:01,410 normal position at is being rigidly 82 00:04:08,030 --> 00:04:05,370 fastened to the supporting base cable 83 00:04:13,190 --> 00:04:08,040 installation in the 150 ton derrick is 84 00:04:15,190 --> 00:04:13,200 complete site work around the test stand 85 00:04:17,570 --> 00:04:15,200 and support building is continuing with 86 00:04:21,440 --> 00:04:17,580 approximately 60% of the concrete 87 00:04:23,480 --> 00:04:21,450 sections port assembly of the s-1 C 88 00:04:25,909 --> 00:04:23,490 transporter was completed at Marshall 89 00:04:26,840 --> 00:04:25,919 this quarter mechanical hydraulic and 90 00:04:29,270 --> 00:04:26,850 electrical check 91 00:04:31,580 --> 00:04:29,280 have been performed the 100-ton 92 00:04:34,340 --> 00:04:31,590 transporter which has a total of twenty 93 00:04:35,660 --> 00:04:34,350 four wheels consists of $2 which will be 94 00:04:39,200 --> 00:04:35,670 bolted to the ends of the 95 00:04:43,340 --> 00:04:39,210 self-supporting s1c stage road tests 96 00:04:46,550 --> 00:04:43,350 will start next quarter at Marshalls 97 00:04:48,890 --> 00:04:46,560 Michou Operations Boeing's s1c activity 98 00:04:51,770 --> 00:04:48,900 this quarter included fabrication of the 99 00:04:54,200 --> 00:04:51,780 16 and 1/2 ton forward handling ring a 100 00:04:57,440 --> 00:04:54,210 tool which will be used in all phases of 101 00:04:59,390 --> 00:04:57,450 movement of the s1c stage followed the 102 00:05:02,360 --> 00:04:59,400 ring failed in its initial tests in 103 00:05:05,330 --> 00:05:02,370 miche's proof load facility later tests 104 00:05:07,640 --> 00:05:05,340 following repair were successful and the 105 00:05:09,620 --> 00:05:07,650 ring was sent to the Marshall Center the 106 00:05:15,320 --> 00:05:09,630 final two rings are now being assembled 107 00:05:17,330 --> 00:05:15,330 at Michou the s1 CT inter tank was 108 00:05:19,280 --> 00:05:17,340 completed at Boeing Michou during the 109 00:05:23,060 --> 00:05:19,290 report period and will be shipped to 110 00:05:24,980 --> 00:05:23,070 Marshall shortly 660 degree skin panels 111 00:05:27,290 --> 00:05:24,990 are joined on the inter tech final 112 00:05:29,840 --> 00:05:27,300 assembly fixture to form the connecting 113 00:05:34,850 --> 00:05:29,850 link between the s-1 seed locks and fuel 114 00:05:36,710 --> 00:05:34,860 tanks the s-1 see forward skirt assembly 115 00:05:39,200 --> 00:05:36,720 fixture has been installed at miss you 116 00:05:41,420 --> 00:05:39,210 by bowing the skirt assembly which will 117 00:05:44,480 --> 00:05:41,430 be made here functions as the connecting 118 00:05:48,050 --> 00:05:44,490 link between the s-1 C stage and the s2 119 00:05:49,850 --> 00:05:48,060 stage this use vertical Assembly 120 00:05:51,890 --> 00:05:49,860 Building construction is now completed 121 00:05:53,930 --> 00:05:51,900 final work this Porter included 122 00:05:56,750 --> 00:05:53,940 installation of the 180 ton capacity 123 00:05:58,760 --> 00:05:56,760 overhead bridge crane installation of 124 00:06:02,720 --> 00:05:58,770 tooling and test equipment is presently 125 00:06:05,720 --> 00:06:02,730 underway at Boeing's plant into Wichita 126 00:06:08,210 --> 00:06:05,730 Kansas s1c support work such as this 127 00:06:12,710 --> 00:06:08,220 routing of fuel tank fittings continued 128 00:06:15,230 --> 00:06:12,720 during the report period at Boeing 129 00:06:17,840 --> 00:06:15,240 Seattle a welded locked tunnel 40 feet 130 00:06:20,120 --> 00:06:17,850 long and 25 inches in diameter was 131 00:06:22,040 --> 00:06:20,130 fabricated on a crash basis when 132 00:06:29,629 --> 00:06:22,050 difficulty was encountered in properly 133 00:06:33,920 --> 00:06:31,640 at the CEO beach facility of North 134 00:06:38,390 --> 00:06:33,930 American Aviation space and information 135 00:06:40,550 --> 00:06:38,400 systems division s2 structural test 136 00:06:42,830 --> 00:06:40,560 stage assembly progressed this quarter 137 00:06:46,700 --> 00:06:42,840 with the aft common bulkhead completed 138 00:06:48,920 --> 00:06:46,710 in February construction of the vertical 139 00:06:55,100 --> 00:06:48,930 assembly and hydro test building at seal 140 00:06:57,320 --> 00:06:55,110 Beach is now more than 80% complete the 141 00:07:00,140 --> 00:06:57,330 structural static tests tower is more 142 00:07:02,779 --> 00:07:00,150 than 55 percent complete steel frames 143 00:07:06,950 --> 00:07:02,789 stairways handrails and walkways have 144 00:07:08,689 --> 00:07:06,960 been erected to the 130 foot level at 145 00:07:10,939 --> 00:07:08,699 the Santa Susana propulsion field 146 00:07:13,610 --> 00:07:10,949 laboratory construction of the all 147 00:07:15,469 --> 00:07:13,620 systems tests and is virtually complete 148 00:07:18,129 --> 00:07:15,479 with ground support equipment and 149 00:07:21,379 --> 00:07:18,139 control equipment wiring being installed 150 00:07:23,179 --> 00:07:21,389 at the Battleship test stand the service 151 00:07:27,490 --> 00:07:23,189 tower and the flame deflector are 152 00:07:30,649 --> 00:07:27,500 complete and the spillway has been paved 153 00:07:32,929 --> 00:07:30,659 in late December the battleship LOX tank 154 00:07:35,089 --> 00:07:32,939 was filled with liquid nitrogen and a 155 00:07:36,379 --> 00:07:35,099 chilled test was conducted the purpose 156 00:07:39,079 --> 00:07:36,389 of the test was to evaluate 157 00:07:41,659 --> 00:07:39,089 effectiveness of the flexible seal that 158 00:07:43,640 --> 00:07:41,669 surrounds the LOX tank and to determine 159 00:07:46,010 --> 00:07:43,650 how well the seal adheres to the tank 160 00:07:48,680 --> 00:07:46,020 when subjected to cryogenic temperatures 161 00:07:53,629 --> 00:07:48,690 test results indicated there was no 162 00:07:56,390 --> 00:07:53,639 leakage around the seal at Essen tidies 163 00:07:59,059 --> 00:07:56,400 facility at Slauson California tooling 164 00:08:01,689 --> 00:07:59,069 for the manufacturing of s2 bulkhead sub 165 00:08:03,860 --> 00:08:01,699 assemblies was installed this quarter 166 00:08:06,950 --> 00:08:03,870 separation testing of a full-scale 167 00:08:09,110 --> 00:08:06,960 simulated s2 interstage skirt section 168 00:08:12,200 --> 00:08:09,120 was successfully accomplished by essent 169 00:08:14,450 --> 00:08:12,210 ID at donee objectives of the tests are 170 00:08:17,209 --> 00:08:14,460 to verify that the linear shaped charge 171 00:08:19,399 --> 00:08:17,219 separation system is satisfactory for 172 00:08:23,510 --> 00:08:19,409 structural integrity and functional 173 00:08:25,760 --> 00:08:23,520 operation quarter-scale liquid hydrogen 174 00:08:28,189 --> 00:08:25,770 test tank number 2 was delivered to s 175 00:08:31,219 --> 00:08:28,199 and ids down a facility on December 31st 176 00:08:34,550 --> 00:08:31,229 by the subcontractor later the tank was 177 00:08:36,889 --> 00:08:34,560 pressurized with helium 7 and 1/2 psig 178 00:08:39,969 --> 00:08:36,899 and each weld seam was checked with a 179 00:08:47,290 --> 00:08:39,979 mass spectrometer leak detection probe 180 00:08:52,850 --> 00:08:50,480 at Douglas aircrafts Sacramento test 181 00:08:54,740 --> 00:08:52,860 facility s4b battleship tank 182 00:08:57,170 --> 00:08:54,750 pre-installation preparation was 183 00:08:59,660 --> 00:08:57,180 completed and the stage was installed in 184 00:09:02,570 --> 00:08:59,670 beta test stands number one on December 185 00:09:05,270 --> 00:09:02,580 18th water calibration of the battleship 186 00:09:07,550 --> 00:09:05,280 tank was completed successfully later in 187 00:09:09,830 --> 00:09:07,560 the report period installation of 188 00:09:12,700 --> 00:09:09,840 exterior components is underway and will 189 00:09:15,140 --> 00:09:12,710 continue next quarter 190 00:09:17,930 --> 00:09:15,150 construction of the all systems test 191 00:09:20,000 --> 00:09:17,940 stand beta 3 continued this quarter with 192 00:09:23,800 --> 00:09:20,010 installation of structural steel and 193 00:09:26,120 --> 00:09:23,810 building of propellant storage tanks 194 00:09:28,130 --> 00:09:26,130 initial ground support equipment for the 195 00:09:30,520 --> 00:09:28,140 beta control center arrived during the 196 00:09:32,990 --> 00:09:30,530 report period and was installed 197 00:09:36,530 --> 00:09:33,000 completion of GIC installation is 198 00:09:38,750 --> 00:09:36,540 scheduled next quarter this manual gse 199 00:09:41,300 --> 00:09:38,760 will be converted to automatic for 200 00:09:46,520 --> 00:09:41,310 acceptance firing of s4b stages early 201 00:09:49,420 --> 00:09:46,530 next year construction of complex gamma 202 00:09:52,280 --> 00:09:49,430 at sacto is now over 75% complete 203 00:09:55,420 --> 00:09:52,290 complex gamma will be used to static 204 00:09:57,830 --> 00:09:55,430 test s4b auxiliary propulsion modules 205 00:10:02,840 --> 00:09:57,840 the complex is scheduled for completion 206 00:10:04,730 --> 00:10:02,850 next quarter at the Douglas Huntington 207 00:10:07,610 --> 00:10:04,740 Beach facility the liquid oxygen tank 208 00:10:10,100 --> 00:10:07,620 assembly for the s4 be hydrostatic test 209 00:10:12,380 --> 00:10:10,110 stage was installed in assembly tower 210 00:10:14,480 --> 00:10:12,390 number one this quarter the tank 211 00:10:18,830 --> 00:10:14,490 assembly had been fabricated at Douglas 212 00:10:20,960 --> 00:10:18,840 sera Monaco after movement of the 213 00:10:23,660 --> 00:10:20,970 hydrostatic test stage liquid hydrogen 214 00:10:25,940 --> 00:10:23,670 tank into the tower welding of the tank 215 00:10:30,140 --> 00:10:25,950 to the LOX tank was accomplished and the 216 00:10:32,120 --> 00:10:30,150 forward dome was welded on later the 217 00:10:34,130 --> 00:10:32,130 entire propellant tank was moved to 218 00:10:36,260 --> 00:10:34,140 assembly tower number two we're 219 00:10:38,660 --> 00:10:36,270 machining of skirt attach angles will 220 00:10:42,970 --> 00:10:38,670 take place next quarter the stage will 221 00:10:47,510 --> 00:10:45,620 assembly of the dynamic test stage was 222 00:10:50,060 --> 00:10:47,520 also begun this quarter at Huntington 223 00:10:51,920 --> 00:10:50,070 Beach the LOX tank assembly received 224 00:10:56,350 --> 00:10:51,930 from Santa Monica was positioned an 225 00:11:01,460 --> 00:10:59,210 the liquid hydrogen tank for the dynamic 226 00:11:03,560 --> 00:11:01,470 test stage was positioned for welding as 227 00:11:05,090 --> 00:11:03,570 the quarter ended the stage will be 228 00:11:08,330 --> 00:11:05,100 shipped to the Marshall Center in 229 00:11:16,430 --> 00:11:08,340 December 1964 for dynamic testing as 230 00:11:18,200 --> 00:11:16,440 part of the Saturn 5 vehicle propulsion 231 00:11:20,570 --> 00:11:18,210 system testing of the first f1 232 00:11:22,430 --> 00:11:20,580 production engine built by Rocketdyne 233 00:11:24,950 --> 00:11:22,440 began at the Marshall Center this 234 00:11:34,610 --> 00:11:24,960 quarter in the modified s1 static test 235 00:11:36,650 --> 00:11:34,620 stand a total of fourteen static firings 236 00:11:39,830 --> 00:11:36,660 was conducted for a total main stage 237 00:11:44,120 --> 00:11:39,840 time of 403 seconds the longest firing 238 00:11:45,950 --> 00:11:44,130 was for 122 seconds about 175 engine and 239 00:11:48,590 --> 00:11:45,960 facility performance measurements were 240 00:11:52,670 --> 00:11:48,600 recorded during each test the firings 241 00:11:55,220 --> 00:11:52,680 were continued next quarter at Marshalls 242 00:11:57,080 --> 00:11:55,230 f1 engine test stand erection of steel 243 00:11:59,090 --> 00:11:57,090 superstructure has been completed and 244 00:12:01,550 --> 00:11:59,100 the 100 ton Derrick has been installed 245 00:12:02,810 --> 00:12:01,560 siding installation on the elevator 246 00:12:05,090 --> 00:12:02,820 tower is in progress 247 00:12:07,370 --> 00:12:05,100 the deflector is complete except for 248 00:12:09,410 --> 00:12:07,380 minor welding and painting Technical 249 00:12:11,690 --> 00:12:09,420 Systems and utilities installation is 250 00:12:15,890 --> 00:12:11,700 continuing the preparation building has 251 00:12:17,960 --> 00:12:15,900 been completed and occupied at edwards 252 00:12:20,300 --> 00:12:17,970 rocket site in california a fully 253 00:12:22,940 --> 00:12:20,310 operational heat exchanger was installed 254 00:12:34,680 --> 00:12:22,950 in f1 engine all fourteen this quarter 255 00:12:39,750 --> 00:12:37,890 a number of successful system tests of 256 00:12:42,120 --> 00:12:39,760 production engine number two were held 257 00:12:48,810 --> 00:12:42,130 during the report period in test stand 258 00:12:50,730 --> 00:12:48,820 one be one at rocket dines new 259 00:12:53,430 --> 00:12:50,740 manufacturing building number three at 260 00:12:55,200 --> 00:12:53,440 Canoga Park f1 engine assembly and 261 00:12:58,080 --> 00:12:55,210 check-out are now being carried on 262 00:13:01,640 --> 00:12:58,090 full-time facilities here allow for 263 00:13:03,870 --> 00:13:01,650 building four engines simultaneously 264 00:13:05,850 --> 00:13:03,880 modifications to the water high flow 265 00:13:08,490 --> 00:13:05,860 test facility to increase its capacity 266 00:13:11,490 --> 00:13:08,500 were performed this quarter with piles 267 00:13:14,250 --> 00:13:11,500 being driven down to 65 feet to anchor 268 00:13:16,380 --> 00:13:14,260 the test run piping the increased 269 00:13:19,110 --> 00:13:16,390 capacity will make it possible to obtain 270 00:13:21,270 --> 00:13:19,120 flow information on f1 injectors and 271 00:13:37,860 --> 00:13:21,280 components that closer to normal 272 00:13:43,440 --> 00:13:40,829 on duration static luring tests of the 273 00:13:46,140 --> 00:13:43,450 j2 engine were continued by Rocketdyne 274 00:13:49,170 --> 00:13:46,150 headed santa susana test area during the 275 00:13:56,190 --> 00:13:49,180 report variant the delta to a position 276 00:13:58,350 --> 00:13:56,200 was activated in December in Rocketdyne 277 00:14:00,870 --> 00:13:58,360 structures lab at Canoga Park 278 00:14:03,720 --> 00:14:00,880 a hydraulic gimbal test machine has been 279 00:14:05,760 --> 00:14:03,730 placed in use to test the j2 engine 280 00:14:10,350 --> 00:14:05,770 gimbal bearing assembly in cycling 281 00:14:12,269 --> 00:14:10,360 operations testing of the j2 thrust 282 00:14:14,370 --> 00:14:12,279 chamber assembly determines thrust 283 00:14:18,720 --> 00:14:14,380 chamber and component deflection under 284 00:14:21,150 --> 00:14:18,730 given load conditions in rocket turns 285 00:14:23,460 --> 00:14:21,160 vertical alignment stand the thrust 286 00:14:25,470 --> 00:14:23,470 alignment of the j2 thrust chamber is 287 00:14:29,670 --> 00:14:25,480 determined through a series of optical 288 00:14:31,290 --> 00:14:29,680 and circumferential measuring guides the 289 00:14:33,630 --> 00:14:31,300 geometric center of the chamber is 290 00:14:43,260 --> 00:14:33,640 located so as to be coincident with the 291 00:14:44,240 --> 00:14:43,270 center of the engine gimbal block at the 292 00:14:47,010 --> 00:14:44,250 Marshall Space Flight Center 293 00:14:49,410 --> 00:14:47,020 construction of the saturn v dynamic 294 00:14:51,510 --> 00:14:49,420 test stand continued this quarter with 295 00:14:56,760 --> 00:14:51,520 tower steel erection having reached the 296 00:14:59,220 --> 00:14:56,770 night or 216 foot level excavation for 297 00:15:01,079 --> 00:14:59,230 tunnel B has been completed and forming 298 00:15:03,449 --> 00:15:01,089 for pouring the tunnel floor is in 299 00:15:05,430 --> 00:15:03,459 process the brick and mortar portion of 300 00:15:08,640 --> 00:15:05,440 the fan room in tunnel a has been 301 00:15:10,470 --> 00:15:08,650 finished miscellaneous work about the 302 00:15:13,710 --> 00:15:10,480 stand and determination building is 303 00:15:15,870 --> 00:15:13,720 continuing blockhouse excavation for 304 00:15:17,820 --> 00:15:15,880 Marshalls saturn v ground support 305 00:15:20,519 --> 00:15:17,830 equipment test facility was completed 306 00:15:24,780 --> 00:15:20,529 this quarter test area and roadway 307 00:15:26,430 --> 00:15:24,790 grading are continuing construction 308 00:15:29,190 --> 00:15:26,440 progressed to this quarter on Marshalls 309 00:15:31,500 --> 00:15:29,200 new load test facility a 30 million 310 00:15:34,949 --> 00:15:31,510 pound capacity test tower capable of 311 00:15:37,860 --> 00:15:34,959 testing s1c stages the tower is now up 312 00:15:40,860 --> 00:15:37,870 to its full height of 140 feet and work 313 00:15:45,150 --> 00:15:40,870 is underway on the 155-foot tall hangar 314 00:15:47,040 --> 00:15:45,160 type building which will house it at 315 00:15:49,470 --> 00:15:47,050 Marshalls Mississippi test facility 316 00:15:51,449 --> 00:15:49,480 construction moved ahead steadily at the 317 00:15:54,960 --> 00:15:51,459 three main complexes and under 318 00:15:57,090 --> 00:15:54,970 roads and waterways serving them the 319 00:16:01,109 --> 00:15:57,100 construction dock at Mt earth has been 320 00:16:05,280 --> 00:16:01,119 completed and the cryogenics dock is now 321 00:16:07,590 --> 00:16:05,290 over 50% finished at the Support 322 00:16:11,369 --> 00:16:07,600 Services complex construction progressed 323 00:16:15,199 --> 00:16:11,379 on the warehouse site maintenance 324 00:16:19,919 --> 00:16:15,209 building emergency services building 325 00:16:22,769 --> 00:16:19,929 central heating plant 115,000 volt 326 00:16:25,679 --> 00:16:22,779 electrical substation and telephone and 327 00:16:28,049 --> 00:16:25,689 communications building at the 328 00:16:30,179 --> 00:16:28,059 laboratory and engineering complex work 329 00:16:32,309 --> 00:16:30,189 is underway on the lab and engineering 330 00:16:36,600 --> 00:16:32,319 building which will serve as Mississippi 331 00:16:39,480 --> 00:16:36,610 test Operations headquarters and at the